Hi, does anyone have any experience setting up a master PID with 2 slaves? We are wanting to control the pressure of a pipeline that downstream splits into 2 process streams, each with a flow controller. We can have both or only one process stream on at any time. looking for adive how this could be setup in deltav.
In reply to John Rezabek:
Andre Dicaire