Hi folks,
I am looking at an option to calculate the total run time of a pump (VFD) based on the pump's RUN status from the field in the Control Studio.
A custom block in which when the field value corresponding to RUN status turns "ON" (or 1), the "time accumulation" starts i,e increments. When the RUN status goes OFF (0), the block holds the total accumulated time till that point and then increments when the status is turned ON again. (0 to 1 pulse).
The accumulation function starts on the first day of every month and resets on the last day of the month.
Any previous experience on such an application.
Thank you.
SD.
In reply to dave_marshall:
In reply to GeloCortez:
In reply to Matt Stoner: