Hi DeltaV Gurus,
We have an Enterprise PI system with a PI-PI link to our DeltaV advanced continuous historian. I would like to send down a hand full of data points from the Enterprise PI down to DeltaV so I can use them in a control scheme. Can anyone describe how this can be configured? I have an idea how you could configure data from the Enterprise PI to the advanced Historian but how to get the data from the Advanced Historian to a DeltaV Tag?
Thanks in advance.
Bob
In reply to Bob McIntyre:
In reply to Matthew Arthur:
Andre Dicaire