I have a problem, someone change the network time in the professional plus from 2/2/2013 to 28/2/2013 and since that my trends look like average, a mean looks just as a line in the charts of the process history view, i think that 6 files with the date of modification 28/2/2013 is the problem but i cant be sure
Future files are the problem?