Control Utilization

It can be shocking to examine control utilization in a plant where performance tools have not been installed and/or not used. For example, in the mid-1980s a control survey was conducted at a major pulp and paper plant where the control system had recently been updated to the latest distributed control system. At that time … Continue reading » Read the full text.