Emerson Exchange 365
Search
User
Site
Search
User
Replies
0 replies
Subscribers
5479 subscribers
Views
6323 views
Users
0 members are here
Recent DeltaV Community Connect Discussions
Christiana Spencer
26 Aug 2021 2:45 PM
Upgrade DV while renaming all servers
1 Reply
ApurvaPatel
20 Aug 2021 10:35 AM
PK with VIm
0 Replies
MPHymel
18 Aug 2021 2:22 PM
PCSD class for Wireless devices
0 Replies
ccranton
13 Aug 2021 5:38 PM
Rolling Alarms/Hour - DeltaV Operator Display and Historical Collect
3 Replies
john
13 Aug 2021 3:17 PM
Single transmitter to DCS and ESD
7 Replies
<
>
Similar Posts
Downloading a Running Phase on Redundant Controller
Downloading to a running Unit Phase - Redundant Controller Warning
Risk of Downloading a Redundant M-Series Serial I/O Card on a Running Process
How to detect if DeltaV Operate is running
DeltaV Operate Run/Configure Parameter
Share
DeltaV operate(Run) redundancy
Dear Expert
We are using deltaV 10.3 in our plant and our deltaV system use redundant MQ controller. If primary controller fail then secondary controller switch over and taking all responsibility. But our deltaV operate (Run) system not switching. My question is deltaV use software redundancy for graphics redundancy ?? Please guide me to overcome this problem.
Regards
Krishna