Emerson Exchange 365
Search
User
Site
Search
User
Replies
0 replies
Subscribers
5480 subscribers
Views
6284 views
Users
0 members are here
Recent DeltaV Community Connect Discussions
ElectroTech
2 Jan 2024 4:28 PM
Single RDP Session To Server 2022 Machines
2 Replies
naira182
14 Dec 2023 8:51 AM
Auto Adjust of Faceplates on DeltaV Live
3 Replies
Invalid String
11 Dec 2023 11:08 PM
DeltaV 13.3.1 | PHV Connecting to the wong data server
0 Replies
ATK
8 Dec 2023 7:22 PM
Regarding Rosemont 2051 Rev 2.1 DD file For DeltaV 10.3
3 Replies
TreyB
30 Nov 2023 8:57 PM
Area Control Network over VPN
13 Replies
<
>
Similar Posts
Downloading a Running Phase on Redundant Controller
Downloading to a running Unit Phase - Redundant Controller Warning
Risk of Downloading a Redundant M-Series Serial I/O Card on a Running Process
How to detect if DeltaV Operate is running
DeltaV Operate Run/Configure Parameter
Share
DeltaV operate(Run) redundancy
Dear Expert
We are using deltaV 10.3 in our plant and our deltaV system use redundant MQ controller. If primary controller fail then secondary controller switch over and taking all responsibility. But our deltaV operate (Run) system not switching. My question is deltaV use software redundancy for graphics redundancy ?? Please guide me to overcome this problem.
Regards
Krishna