Emerson Exchange 365
Search
User
Site
Search
User
Replies
2 replies
Subscribers
5474 subscribers
Views
11518 views
Users
0 members are here
Recent DeltaV Community Connect Discussions
István Orbán
16 Dec 2024 11:19 AM
Recipe Authorization
1 Reply
Adam Villhauer
13 Dec 2024 3:49 PM
CAT5 or CAT6 for EIOC and PK networks.
3 Replies
Jesse Delanoy
10 Dec 2024 2:10 PM
Parse Error
4 Replies
Stas K.
5 Dec 2024 10:40 PM
Deltav Account Length
4 Replies
MarcS
21 Nov 2024 2:13 PM
Export user manager
1 Reply
<
>
Similar Posts
DeltaV switchover Problem
Redundant controller and switchover
DeltaV Batch Executive Redundancy Switchover
Switchover during Total CTRL Download
Redundant CIOC and EIOC Behavior on Switchover
Share
Manual_ switchover
How I initiate manual switchover of redundant controller with deltaV diagnostics ?
2 Replies
Hassan.hameed
7 Jun 2020 2:06 PM
Hi
First should be in sure that all redundant parameter status is good when you press on standby controller show these parameter after that check the communication of standby controller and go to the standby controller and right click select switch over and accept the popup message that appear to you now the switch over process is began and check the led for controller it start flash and after that it check after few second in diagnostic you can find it done ,be careful when do that to avoid any trip in plant.
krishna sen
7 Jun 2020 2:30 PM
Thanks a lot.