we had recently received a tec2000 actuator, which we connected to our control system . The wiring as done was per the wiring diagram provided in the separate terminal chamber( STC ) that is terminals 25 and 26 for analog control set point (AI) and 27 and 28 for analog position feedback (AO).
In reply to alan thomas:
Nelson Zepeda | Service Manager | Valve Automation Emerson Process Management | 13840 Pike Road | Missouri City | TX | 77489 | USAT + 1 281-403-4136 | M + 1 281-546-3827