Re: Batch Executive Watchdog Failure Occurs Everytime A Particular Operation Is Loaded into BOI

Do you only have one controller running all batch phase logic?

If so what is your baseline loading? (Fretim and fremem when no phases loaded)

Do the phases loaded have a large number of parameters? Initial download of phases with many parameters can take a lot of resources temporarily.

 

Youssef El-Bahtimy | Systems Integration Technologist
PROCONEX | 103 Enterprise Drive | Royersford, PA 19468 USA
Proconex Office: 610 495 2970 | Cell: 267 275 7513
Youssef.El-Bahtimy@ProconexDirect.com