0054 To Ensure Uptime Of 30 MW Blowers For Maximum Steel Plant Productivity_ ArcelorMittal_ Basin_ Ilchenko

To support smelting of metal at the largest metallurgical enterprise in Kazakhstan, ArcelorMittal Temirtau, 7 blowers must work simultaneously, bringing 7000 m3 / min of air into blast furnace. Reliability of these critical production assets directly affects the efficiency of the blast furnace and at the end - amount of metal smelting. The shutdown of even one of the compressors (air blowers), that supplies air to the blast furnace, means an emergency that causes a significant decrease in the blast furnace operation mode = production drop down in metal smelting.
Report on how to implement a solution that solves problem of blowers failure due to a power shut down or false alarms of the anti-surge system.